Skip to main content

Pearland, Texas - City Development Fees

Pearland | City | Houston Metro Southeast / Gulf Coast | Houston-The Woodlands-Sugar Land, TX MSA | Primary county: Brazoria (secondary: Fort Bend, Harris) | FIPS 4856348

Pearland is a Houston-metro southeast suburb spanning Brazoria, Fort Bend, and Harris counties. The City of Pearland Community Development Department administers developer-side fees through the Permits and Development Fees page, which organizes the operative schedule into four exhibits: Exhibit A (Planning - zoning, platting, variances), Exhibit B (Public Works and Engineering - impact fees, pro-rata, tap, traffic impact analysis, sidewalk), Exhibit C (Construction Permit - building, electrical, mechanical, plumbing, miscellaneous), and Exhibit D (Fire Department). Permits are filed through the CityWorks Permitting Portal. Department address: 3519 Liberty Dr., Pearland TX 77581; main line 281.652.1600.

On this page
  1. Fee summary
  2. Impact fees
  3. Zoning fees
  4. Utility tap fees
  5. Coverage notes
  6. Fee authorities
  7. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Water and Sewer Impact Fees Confirmed Calculated per the City's most current adopted impact fee study at the time of platting (Section IB of Exhibit B) 2026-01-21
Pro-Rata Fees by Service Area Confirmed Park Street $354.29/$537.83 per 25' lot water/sewer; Pearland Parkway 96.9 ac at $776 water and 360.2 ac at $584.33 sewer; Service Areas 1 and 2 by acre rate 2026-01-21
Parkland Dedication and Park Development Confirmed Single Family $1,225 dedication plus $292 development = $1,517 per DU; Multi-Family $900 plus $214 = $1,114 per DU 2026-01-21
Traffic Impact Analysis Review Confirmed $750 per Thoroughfare Amendment Review 2026-01-21
Zoning, Plat, and Building Permit Fees Confirmed Exhibits A, C, D - full development-side surface across planning applications, building, electrical, mechanical, plumbing, and Fire Department permits 2026-01-21
Water and Sewer Tap Fees Confirmed Actual cost, not less than $250 2026-01-21
Proffers Not applicable Texas jurisdictions do not use Virginia-style cash proffers -
Special District Fees (TIRZ / MUD / PID) Not administered by this city Houston-metro TIRZ, MUD, and PID overlays administer developer-side charges separately from the City schedule; not consolidated on the City fee surface -

Impact Fees, Pro-Rata, Parkland and Traffic - Current Operative Schedule

Source: City of Pearland Permits and Development Fees - Exhibit B (Public Works and Engineering Fee Schedule), sections I, II, IV-VII (page SHA-256 5ecf0818...). Pearland's Water and Sewer Impact Fees per Section IB are computed from the City's adopted impact fee study at the time of platting rather than published as a flat-posted schedule. Pro-rata fees, sidewalk in lieu, traffic impact analysis, and park dedication and development fees are explicit line items.

Water and Sewer Impact and Pro-Rata Fees

Fee ItemAmount
Water and Sewer Impact FeeBased on most current applicable impact fee study at the time of platting (rates per the City's operative LUE-based study)
Pro-Rata - Park Street Lots 1-23 Block 25 (Water)$354.29 per 25' lot ($14.17 per linear foot)
Pro-Rata - Park Street Lots 1-23 Block 25 (Sewer)$537.83 per 25' lot ($21.51 per linear foot)
Pro-Rata - Park Street Lots 26-44 Block 26 (Water)$354.29 per 25' lot ($14.17 per linear foot)
Pro-Rata - Park Street Lots 26-44 Block 26 (Sewer)$537.83 per 25' lot ($21.51 per linear foot)
Pro-Rata - Pearland Parkway/Barry Rose to Mary's Creek (Water)96.9 acres at $776.00 per acre
Pro-Rata - Pearland Parkway/Barry Rose to Mary's Creek (Sewer)360.2 acres at $584.33 per acre
Pro-Rata - FM 518 at FM 1128 west of Reid Blvd, North Side (Sewer)$44.60 per linear foot
Pro-Rata - FM 518 at FM 1128 west of Reid Blvd, South Side (Sewer)$53.91 per linear foot
Pro-Rata - Service Area 1 (Water)1,638 acres at $41.00 per acre
Pro-Rata - Service Area 1 (Sewer)1,638 acres at $15.00 per acre
Pro-Rata - Service Area 2 (Water)521 acres at $74.00 per acre
Pro-Rata - Service Area 2 (Sewer)2,221 acres at $33.00 per acre

Parkland, Traffic, Sidewalk

Fee ItemAmount
Traffic Impact Analysis / Thoroughfare Amendment Review Fee$750.00
Parkland Dedication Fee in Lieu - Single Family$1,225 per DU
Parkland Dedication Fee in Lieu - Multi-Family$900 per DU
Park Development Fee - Single Family$292 per DU
Park Development Fee - Multi-Family$214 per DU
Total Park Fee - Single Family (Dedication + Development)$1,517 per DU
Total Park Fee - Multi-Family (Dedication + Development)$1,114 per DU
Sidewalk Fee in Lieu$7.00 per sq ft (subject to current contract price)

Planning, Zoning, Plat, and Permit Fees - Current Operative Schedule

Source: City of Pearland Permits and Development Fees - Exhibit A (Planning), Exhibit C (Construction Permit Schedule), Exhibit D (Fire Department Schedule). Captured comprehensive development-side surface from the operative City schedule.

Zoning and Conditional Use Permit Applications by Tract Size

Tract SizeStandard ApplicationPUD / Planned Development
0 to less than 5 acres$150 processing + $850 + $25 per zoning type$150 processing + $1,650
5 to less than 25 acres$150 processing + $850 + $25 per zoning type$150 processing + $1,850
25 to less than 50 acres$150 processing + $875 + $25 per zoning type$150 processing + $2,250
50 to less than 75 acres$150 processing + $900 + $25 per zoning type$150 processing + $2,850
75 to less than 100 acres$150 processing + $925 + $25 per zoning type$150 processing + $3,650
100 acres and over$150 processing + $950 + $25 per zoning type$150 processing + $4,450
Required Notifications - Legal Notice$50.00 per notice-
Required Notifications - Public Hearing Mailouts$1.00 per letter-

Subdivision Plats, Replats, Cluster Plans, Variances

Fee ItemAmount
Preliminary Subdivision/Development Plat - Residential (per lot)$150 processing + $850 filing + $8.00 per lot
Preliminary Subdivision/Development Plat - Commercial/Industrial/Multi (per acre)$150 processing + $850 filing + $30.00 per acre
Final Subdivision/Development Plat - Residential (per lot)$150 processing + $850 filing + $8.00 per lot
Final Subdivision/Development Plat - Commercial/Industrial/Multi (per acre)$150 processing + $850 filing + $30.00 per acre
Vacation of Subdivisions$600.00 per gross acre
Extension of Approval$150 filing fee
Minor Plat (residential lots, per lot)$150 processing + $850 filing + $6.00 per lot
Minor Plat (one lot with existing home or business)$150 filing fee
Amending Plat$150 processing + $450 filing + $6.00 per lot increase (max 6 lots)
Re-plat - Residential$150 processing + $450 filing + $6.00 per lot increase
Re-plat - Commercial$150 processing + $450 filing + $30.00 per acre commercial
Master Plat - Residential (per lot)$150 processing + $450 filing + $6.00 per lot
Master Plat - Commercial (per acre)$150 processing + $450 filing + $30.00 per acre
Recheck of Plats and Construction Drawings$200.00
Second Submittal Fee$200.00
Cluster Plans - 0 to less than 5 acres$1,800
Cluster Plans - 5 to less than 25 acres$2,000
Cluster Plans - 25 to less than 50 acres$2,400
Cluster Plans - 50 to less than 75 acres$3,000
Cluster Plans - 75 to less than 100 acres$3,800
Cluster Plans - 100 acres and over$4,600
P and Z Subdivision Variance$150 processing + $250 filing
Zoning Board of Adjustments - Variance/Special Exception (Residential)$150 processing + $350 filing
Zoning Board of Adjustments - Variance/Special Exception (Commercial)$150 processing + $350 filing
Zoning Verification Letter (Residential)$25.00
Zoning Verification Letter (Commercial)$35.00
Rescheduling of Item Posted for Board/Commission/Council$150.00
Variance Application Fee (Public Works)$250.00

Building, Trade, and Fire Permits (Exhibits C and D)

Fee ItemAmount
Commercial Building Permit - Civil Site Work$16.50 for first $1,000 + $5.50 per additional $1,000 valuation ($60/sf minimum)
Commercial Building Permit - New Building/Addition/Swimming Pool$16.50 for first $1,000 + $5.50 per additional $1,000 valuation ($100/sf minimum)
Commercial Building Permit - Alteration/Remodel without reconfiguration$16.50 for first $1,000 + $5.50 per additional $1,000 valuation ($30/sf minimum of work area)
Commercial Building Permit - Alteration/Remodel with reconfiguration$16.50 for first $1,000 + $5.50 per additional $1,000 valuation ($60/sf minimum of work area)
Commercial Accessory Structure - Minor (up to 2 inspections)$120.00
Commercial Accessory Structure - Major (3+ inspections)$180.00
Sign/Fence/Miscellaneous Building Permits$16.50 for first $1,000 + $5.50 per additional $1,000 valuation
Residential New 1-2 family/townhomes/additions$0.41 per sq ft
Residential Alteration/Remodel without reconfiguration$120.00
Residential Alteration/Remodel with reconfiguration$180.00
Manufactured Home Placement$180.00
Residential Accessory Structure - Minor (1 inspection)$60.00
Residential Accessory Structure - Major (2+ inspections)$120.00
Residential Swimming Pool$350.00
Residential Miscellaneous Permit$60.00
Commercial Electrical Permit - $0 to $2,000 valuation$50.00
Commercial Electrical Permit - $2,000 to $50,000 valuation$50 + $2.25 per $1,000 over $2,000
Commercial Electrical Permit - $50,000 to $500,000 valuation$158 + $2.75 per $1,000 over $50,000
Commercial Electrical Permit - $500,000+ valuation$1,395.50 + $3.25 per $1,000 over $500,000
Commercial Other Electrical Work$120.00
Residential Electrical Permit - New/Addition$200 for first 2,500 sq ft + $6.50 per 100 sq ft over 2,500
Residential Electrical Remodel/Alteration/Swimming Pool$120.00
Residential Other Electrical Work$60.00
Commercial Mechanical Permit (tiered same as Electrical)$50 to $1,395.50 + tier-based incremental
Residential Mechanical New/Addition$160 for first 2,500 sq ft + $3.25 per 100 sq ft over 2,500
Commercial Plumbing Permit (tiered same as Electrical)$50 to $1,395.50 + tier-based incremental
Residential Plumbing New/Addition$200 for first 2,500 sq ft + $6.50 per 100 sq ft over 2,500
Operating Certificate Permit - without food prep$180.00
Operating Certificate Permit - with food prep$300.00
Grading Permit$125.00
Demolition Permit$60.00
Moving (Placement) Permit$180.00
Re-Inspection Fee$75.00
Plan Review FeeOne-half of the building permit fee
Special Inspection (Same day/after hours)$120.00
Temporary Certificate of Occupancy$60.00 per Division inspection
Fire - Fire Alarm/Protection/Sprinkler/Sprinkler Alteration$60 for first $8,000 valuation + $5.50 per $1,000 thereafter
Fire Plan Check FeeOne-half of total Fire Commercial Building Permit fee
Fire Marshall Inspection Fail (first/second)$75.00 each
Fire Marshall Inspection Fail (beyond 2nd)$200.00
Fire Special Inspection$200.00
Inspection Fees for New Subdivision Construction1% of direct construction cost
Construction Inspection After Hours/Weekends$60.00 per hour
Construction Inspection Holidays$75.00 per hour
Pearland Parkway Street Light Charge$1,200.00 per pole
Street Light O and M Escrow (Two Years)$16.00-$25.00 per light per month (minimum $384 per light)
Consent to Encroach (City Utility Easement)$250.00

Water and Sewer Tap Fees

Source: City of Pearland Permits and Development Fees - Exhibit B Section III WATER AND/OR SEWER TAP FEE. The City posts a single tap-fee line: Actual cost, not less than $250.00. Payment is due before connection (existing building) or before building permit issuance (new building). Water and sewer impact fees (separate scope under Section IB) and pro-rata service-area fees are captured under impact fees above.

Fee ItemAmount
Water and/or Sewer Tap FeeActual cost, not less than $250.00

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Pearland Water and Sewer Impact Fee Study Per-LUE Amounts

Section IB of Exhibit B references the City's adopted impact fee study and computes water and sewer impact fees per Living Unit Equivalent at the time of platting. The schedule itself does not post per-LUE flat amounts on the Permits and Development Fees page captured here. A future ZoneFee source review will locate the City's adopted Impact Fee Study PDF (typically administered under Texas Local Government Code Chapter 395) and capture per-LUE amounts directly. Closed-search outcome: study referenced; per-LUE amounts not yet enumerated on this page.

Effective Date Sourcing

The effective date used above (2026-01-21) is taken from the page CMS HTTP last-published header rather than a posted ordinance adoption date. Page-published timestamp is the strongest currency signal available on the public source; the underlying fee-bearing ordinances may have older adoption dates. The City's Comprehensive Fee Schedule and individual ordinances remain authoritative for adoption dates of specific line items.

Proffers

Texas jurisdictions do not use Virginia-style cash proffers (Virginia Code Section 15.2-2303 has no Texas counterpart). Pearland's developer-side capital contribution occurs through water and sewer impact fees, pro-rata fees, tap fees, parkland dedication, and platting fees captured above. Closed-search outcome: this fee family does not apply to this jurisdiction.

Special District Fees (TIRZ / MUD / PID)

Pearland TX spans Brazoria, Fort Bend, and Harris counties in the Houston-The Woodlands-Sugar Land MSA. Multiple Tax Increment Reinvestment Zone (TIRZ), Municipal Utility District (MUD), and Public Improvement District (PID) overlays administer their own developer-side charges. The Permits and Development Fees page does not surface a consolidated special-district development-side fee schedule administered by the City. Three substitute paths were probed (Permits and Development Fees landing, Community Development root, sitemap.xml index); none surfaced a Pearland-administered consolidated special-district schedule. Closed-search outcome: not administered by this city; each overlay administers its own charges separately.

Fee Authorities

Authority Fee Types Official Website
City of Pearland - Community Development Department Zoning, platting, building permits, electrical, mechanical, plumbing, fire department, water and sewer impact fees (study-based), pro-rata service-area fees, tap fees, parkland dedication and development, traffic impact analysis pearlandtx.gov/departments/community-development

Sources

Document Agency Accessed
Permits and Development Fees - Exhibits A through D (CMS last-published 2026-01-21; SHA-256 5ecf0818...) City of Pearland, TX - Community Development Department 2026-05-14
Community Development Department landing City of Pearland, TX - Community Development Department 2026-05-14

Last verified by ZoneFee: 2026-05-14. Fee schedules are subject to change. Verify current rates directly with the City of Pearland Community Development Department before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Pearland Permits and Development Fees page (current operative schedule; CMS HTTP last-published 2026-01-21; SHA-256 5ecf0818...). The page organizes the operative schedule into Exhibits A (Planning), B (Public Works and Engineering), C (Construction Permit), and D (Fire Department). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. The water and sewer impact fees per Section IB are computed from the City's adopted impact fee study at the time of platting and are not posted as flat per-LUE amounts on this page. Texas jurisdictions do not use Virginia-style cash proffers. Pearland spans Brazoria, Fort Bend, and Harris counties with multiple TIRZ, MUD, and PID overlays administered separately from the City schedule; no consolidated special-district fee schedule is administered by the City. Verify all current rates directly with the City of Pearland Community Development Department before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.